Our Projects

Explore our portfolio of successful construction and engineering projects across Singapore. Each project showcases our commitment to excellence, innovation, and quality craftsmanship.

Ceiling & Storage Retrofit
Renovation 2025

Ceiling & Storage Retrofit

Removal of legacy fixtures, new gypsum ceiling alignment, and concealed storage retrofit to improve M&E access.

Location:Singapore
Size:120 sqm
Duration:1 months
Partition & Acoustic Insulation
Fit-Out 2024

Partition & Acoustic Insulation

Installation of metal stud partitions with mineral wool infill to achieve STC targets for adjacent meeting rooms.

Location:Singapore
Size:85 sqm
Duration:1 months
Wall Reinstatement & Skim Coat
Renovation 2024

Wall Reinstatement & Skim Coat

Surface repair, skim coating, and paint system upgrade for a clean, durable finish in a customer reception area.

Location:Singapore
Size:95 sqm
Duration:1 months
Training Room Makeover
Commercial 2024

Training Room Makeover

Reconfiguration of a training classroom with lighting upgrade, improved HVAC diffusers, and flexible seating layout.

Location:Singapore
Size:150 sqm
Duration:2 months
Power Point Upgrade
Electrical 2025

Power Point Upgrade

New dedicated circuits with RCD protection and clean surface-mount conduit routing for lab equipment.

Location:Singapore
Size:40 sqm
Duration:0.5 months
Workshop Line Marking
Industrial 2025

Workshop Line Marking

Epoxy floor line marking for pedestrian lanes, forklift routes, and staging areas to improve safety compliance.

Location:Singapore
Size:320 sqm
Duration:0.5 months
Warehouse Aisle Restriping
Industrial 2024

Warehouse Aisle Restriping

Mechanical floor prep and solvent-free coating for high-visibility aisle markings and bay identifiers.

Location:Singapore
Size:280 sqm
Duration:0.5 months
Pantry Plumbing Refresh
MEP 2025

Pantry Plumbing Refresh

Sink replacement, trap reconfiguration, and new shutoff valves with leak testing and tidy wall finish.

Location:Singapore
Size:18 sqm
Duration:0.25 months
IT Store Setup
Commercial 2024

IT Store Setup

Rapid deployment of secure equipment storage with shelving, anti-static mats, and asset power points.

Location:Singapore
Size:60 sqm
Duration:0.5 months
HVAC Ceiling Coordination
MEP 2024

HVAC Ceiling Coordination

Duct rerouting and diffuser optimization around new lighting grid; access panels added for maintenance.

Location:Singapore
Size:110 sqm
Duration:1 months
Self-Leveling Compound Floor
Renovation 2024

Self-Leveling Compound Floor

Applied self-leveling underlayment to correct slab variance prior to vinyl plank installation.

Location:Singapore
Size:90 sqm
Duration:0.5 months
Retail Partition Build
Fit-Out 2025

Retail Partition Build

Timber/gypsum partitions with service chases, ready for merchandising wall systems and mirrors.

Location:Singapore
Size:70 sqm
Duration:1 months
Corridor Protection & Logistics
Renovation 2024

Corridor Protection & Logistics

Temporary protection to keep operations running during phased corridor works and door frame replacements.

Location:Singapore
Size:65 sqm
Duration:0.5 months
Split AC Servicing Bay
MEP 2025

Split AC Servicing Bay

Maintenance bay setup with isolators, condensate routing, and test points for HVAC training.

Location:Singapore
Size:35 sqm
Duration:0.25 months
Drywall Taping & Jointing
Fit-Out 2024

Drywall Taping & Jointing

Full jointing and sanding sequence with corner beads and primer to receive architectural paint.

Location:Singapore
Size:100 sqm
Duration:1 months
Loading Bay Reconfiguration
Industrial 2025

Loading Bay Reconfiguration

New partitioning and staging zones to separate inbound QC from outbound packing operations.

Location:Singapore
Size:200 sqm
Duration:1 months
Office Room Conversion
Commercial 2024

Office Room Conversion

Converted an open area into a quiet room with acoustic seals, split AC, and low-glare lighting.

Location:Singapore
Size:45 sqm
Duration:1 months
Gypsum Board Finaling
Fit-Out 2024

Gypsum Board Finaling

Final boarding and screw spotting followed by primer coat to achieve a Level-4 finish.

Location:Singapore
Size:80 sqm
Duration:0.5 months
HVAC Equipment Staging
MEP 2025

HVAC Equipment Staging

Inventory staging and protection prior to installation; coordination with lift booking and cranage.

Location:Singapore
Size:150 sqm
Duration:0.25 months
Show Wall Construction
Commercial 2024

Show Wall Construction

Feature wall with recessed alcove and concealed LED raceways ready for fit-off and display.

Location:Singapore
Size:55 sqm
Duration:0.5 months
AV Wall Mount & Cabling
Electrical 2025

AV Wall Mount & Cabling

Installation of large-format display with trunking, surge protection and tidy cable management.

Location:Singapore
Size:25 sqm
Duration:0.25 months
Pantry Fixture Replacement
MEP 2025

Pantry Fixture Replacement

Replacement of aging tapware and traps; sealant works and splash zone repaint.

Location:Singapore
Size:12 sqm
Duration:0.25 months
Partition Wall Finishing
Fit-Out 2024

Partition Wall Finishing

Boarding, jointing, and surface prep on a new partition with services access hatch.

Location:Singapore
Size:75 sqm
Duration:0.5 months
Access Control Panel Install
Electrical 2024

Access Control Panel Install

Door release, exit button, and controller installation with fail-safe configuration and labeling.

Location:Singapore
Size:10 sqm
Duration:0.25 months

Project Portfolio Overview

150+
Commercial Projects
200+
Residential Projects
75+
Infrastructure Projects
85+
Industrial Projects